Kaua’i road closures starting Sept. 20 – The Garden Island

KOLOA — County and state officers introduced roadvertwork, with associated lane closures and short-term and occasional delays, from Hanalei to Koloa.

All of the work is deliberate Monday by way of Friday, Sept. 20 to 24, till completely differentwise famous.

• A quantity of sections of Koloa and Maluhia roadverts Might have single-lane closures from 7 a.m. To six p.m. for roadvert-striping and completely different operations.

• Shoulder closure and narrowed lanes on Kuhio Freeway between mile markers 5.7 and 6.6 in Wailua and Waipouli are 24 hours a day till further discover.

• A proper-lane closure of Kuhio Freeway in each instructions between mile markers 11.8 and 13.1 in Anahola is from 8:30 a.m. To three:30 p.m. for highway widening to assist set up of A center lane.

• A proper-lane closure of Kuhio Freeway in each instructions between mile markers 12.2 and 16.6 in Kilauea is from 8:30 a.m. to 1:30 p.m. for landscaping and tree trimming.

• A single-lane closure of Kuhio Freeway in each instructions between mile markers 19 and 21.6 in Kilauea is from 8 a.m. To three:30 p.m. for roadvert reconstruction and resurfacing.

• A proper-lane closure of Kuhio Freeway in each instructions between mile markers 23.3 and 25.1 in Kilauea is from 8:30 a.m. to 1:30 p.m. for landscaping and tree trimming.

• The schedule for public entry Out and in of Hanalei on Kuhio Freeway is as follows: right now: two lanes open all day; Monday to Saturday: 12 to 7 a.m. and 5:30 p.m. to 7 a.m., two lanes open; 7 a.m. To 5:30 p.m., single lane alternating visitors.